ProRail

Project duration

January 2013 - April 2016

When the Dutch national railway agency, ProRail, needed to determine the position and geometry of 2,000 km of rail track and switches, Fugro’s unique airborne and train-mounted sensors provided a timely and affordable solution.

Life cycle

Planning, feasibility, conceptual design

Design

Construction

Operations and maintenance

Decommissioning

Show full process

RILA 360 data image.jpg

Rila®

Infographic

RILA®

By creating a digital twin of your network we can deliver a detailed representation of the railway corridor to your desktop 24/7 and replace the need for your own track inspections

Railway infrastructure surveyed in 2 weeks

0

Kilometres

Regulations relating to railway safety are continuously being tightened with European legislation prohibiting survey operatives from accessing the track during operational periods.

This was reflected in the key requirements defined by ProRail, which stipulated: safer survey operations, using remote systems that eliminated the need for surveyors to be trackside; no track possessions, so that disruption to train services was limited; an affordable solution, rich in information to support a “collect once for multiple applications” strategy with a clear value proposition; guaranteed repeatability of survey data to enable effective monitoring; mapping of all 3D track alignments, switches, platforms and all assets along the railway corridor with an absolute accuracy of 15 mm; suitability of all survey data for automatic input to ProRail’s existing computing systems.

Using our innovative RILA® and FLI-MAP® technology, we delivered 2,000 km of highly accurate 3D information for the railway corridor with minimal disruption to normal train services.

The project involved surveying approximately 1,250 km of railway infrastructure each year. Measurements were taken during a 2-week campaign using three independent systems; RILA® Track (track position and video); RILA® 360 (infrastructure and assets); and FLI-MAP® (helicopter LiDAR) sensors, to capture a full 3-dimensional image of the railway.

FLI-MAP® was used to survey the full swath of the track and adjacent features whilst RILA® Track and RILA® 360 were used to scan the rail track itself and the surrounding environment. The RILA® Track system measures absolute track position and geometry to engineering specification accuracy, simultaneously incorporating georeferenced video to record railway assets. Compact and transportable, it connects to the rear of a regular passenger train in less than two minutes and surveys the rail tracks at line speed (i.e. up to 160 km/h). The RILA® 360 uses two rotating laser scanners that record 1 million survey points per second per scanner and provides an ultra-high density 3D point cloud of the surveyed corridor to analyse trackside assets and critical clearance measurements.

The final integrated datasets provided precise rail track geometry data to ensure that assets could be accurately identified, measured and monitored across the rail corridor. This unique approach enabled ProRail to generate highly accurate and up-to-date railway infrastructure information creating a reliable, true picture of the situation on the ground without disturbing normal passenger services on the busy Dutch rail network.

The information derived from the surveys will be utilised for a range of applications including track and signal design and upgrade, electrification, vegetation and slope analysis and asset management.

Without this approach, such a model would have been many times more costly and the turnaround time would have been unacceptable.

Nick van den Hurk

Director, Fugro RailData®

How we can help you

We provide accurate, up-to-date information in a safer, faster more affordable way, with limited disruption to railway traffic, to help rail professionals worldwide design, build, upgrade and maintain railway infrastructure.

MEN03807.jpg

What we do at Fugro

Helping you save time with Geo-data

Find out more

Life cycle

Expertise applied in this project

01

Planning, feasibility, conceptual design

Not in this project

02

Design

Not in this project

03

Construction

Not in this project

04

Operations and maintenance

2 areas of expertise

05

Decommissioning

Not in this project